The boat goes into YachtFitters for the second time.  The first trip was for a few essentials in preparation for the aborted trip to Quartermaster Harbor for a raft up with friends.  That didn't happen.  But the folks at Seacraft Yacht Sales and YachtFitters had done a lot to the boat so that it was ready for the trip - it was done to schedule and done well.  But now its time for more work.

This list of projects includes some of the things done during the commissioning, during this visit to YachFitters as well as a few things I worked on afterwards.  (As I write this in late Sept, I'm still working through the list!)  Items such as stepping the mast aren't listed, but of course were done!  YF - YachtFitters.  SC - Seacraft Yacht Sales.   The list is something like:
  • take off a lot of old equipment off the boat, much of which seemed past its expiry date
  • clean the boat, inside out, bow to stern.  Bilge, all lockers, headliner, walls, cabinets, everything and everywhere
  • new standing rigging (YF)
  • new running rigging (SC)
  • static rig tune.  pin the rig with stainless steel welding rod (YF)
  • fix questus radar mount after damage in shipping (SC)
  • fix GPS damaged in shipping (SC)
  • fix electrical panel at mast base (SC)
  • install new windex (SC)
  • fix mainsail batten pocket which had ripped out (SC)
  • clean genoa and mainsail (SC)
  • replace zincs (YF)
  • service PYI ShaftSeal (YF)
  • free up two frozen seacocks (YF)
  • free up frozen Y-valve in head (YF)
  • fix refrigeration (new control unit) (YF)
  • install new LED tri-anchor light on mast (SC)
  • install new LED nav lights (SC)
  • install all new sensibulb LEDs in the interior (3 red/white dome w/dimmer, all side lights with dimmer, remaining dome lights plain sensibulb.)
  • install lazy jacks (SC)
  • replace fuel filters (YF)
  • change oil, filters
  • change impeller, install speedSeal
  • clean air inlet filter
  • replace all 4 engine mounts (YF)
  • remove old sound deadening material from engine compartment (it was falling apart)
  • install new bilge pump in forward bilge compartment (old pump was not fixed to hull) (YF)
  • fix manual whale bilge pump - was not working
  • buy/install new force 10 2 burner stove (YF & me)
  • buy/install new 20lb propane tank (SC)
  • cleanup electrical panel - some add ons were sloppy (YF)
  • fix throttle cable tension
  • install new house battery bank (4x odyssey group 31.  400Ah.) (YF)
  • install new battery charger/inverter/controller (Outback) (YF)
  • buy new dock lines, splice, whip
  • buy new lock lines, splice, whip
  • buy new fenders
  • buy plate anchor snubber and two lines, splice line to shackles, connect, whip, sieze
  • buy second anchor snubber: chainhook, line, splice, whip
  • have all cushions cleaned
  • buy new anchor (Rocna 20) and chain (300' 5/16ths HT)
  • mark chain in 20' increments.  Twice.
  • buy nylon leader for chain, shackles.  Sieze chain shackles
  • replace sink strainers and connecting hoses
  • clean fresh water tanks (had some sort of growth)
  • clear vents for both fresh water tanks
  • clean/wax topsides
  • clean/wax hull
  • replace missing/broken deck track caps
  • replace gaskets on deck hatches
  • replace gaskets on locker hatches
  • replace gaskets on access panel in cockpit to engine compartment
  • replace gaskets on water tank access ports
  • replace gaskets on portlights (still in progress, 09/09)
  • replace gaskets on dorade vents
  • replace gaskets on fridge (3 times, each with different gasket material, until I found what was good)
  • install knife holder in galley cabinet (over sink, starboard cabinet, port side)
  • install spoon/misc holder beneath sink
  • install toilet brush under sink in head
  • fix leak at rudder post (which explains water in bilge and engine compartment)
  • fix leak at fresh water pump
A few of these items seem innocent enough in the list but standout in my mind.  Replacing the sink strainers took about 10 days.  I found it hard to find the parts and work in that space.  Luckily I wasn't paying myself by the hour for this project.  I finally have an installation that looks good and is well built.

Cleaning the water tanks is an ongoing project.  The tanks are clean but the water does not taste good yet.  All the hoses may need to be replaced.

I'm very happy with the work done for me by both Yacht Fitters and Seacraft Yacht Sales.  In particular, the battery/charger/inverter installation done by Yacht Fitters is fantastic - its a work of art, thanks Justin.



Tom with Seacraft Yacht Sales did a lot of custom work for me with the nav lights and at the mast.  Terry with Yacht Fitters did the rig tune and was involved with most of the projects - there are numerous little touches around the boat which show he has been there - all for the better, most that I would never have thought of.  The folks at YachtFitters (Terry and Justin) are happy to teach you how to work on the projects.  It seems to be their goal to get the owner up to speed with their boat as much as it is for them to complete the projects themselves.  I learned a lot through them and look forward to having the boat back with them soon for some pre-winter projects, and then again for pre-takeoff projects.  YachtFitters has worked on Pacific Seacraft boats many times in the past, which is encouraging as there are some idiosincractic aspects to these boats.